This high risk job was performed with temporary static lines to existing roof to act as a fall restraint system.
Other work was completed out of a 135 ft EWP.
This high risk job was performed with temporary static lines to existing roof to act as a fall restraint system.
Other work was completed out of a 135 ft EWP.