Project Details

Callide Dryscan Sorting Plant

Project Description

  • Client: Sorterra
  • Location:Callide Mine
  • Year Completed: 2018

BWA completed the installation along with the fabrication of many components for the Dryscan Plant at Callide Mine.

The project involved the installation of following:

  • 2 Level Structure with Roof, Partial Walls and Monorail Systems
  • Laser Dryscan Process Unit
  • Feed Conveyor, Product Conveyor and Waste Conveyor
  • Hopper and support structure
  • 3 Conveyors for Mobile Screening Plant
  • Dust Extraction System
  • Compressors, Air Dryer, Air Receivers, Pipework
  • Potable water system
  • Fire water system
  • Earthworks and Concrete works
  • Hopper Retaining Wall
  • Hydraulics System and Rams
  • Various Chutes
  • Hoists