A Major extension project on the existing Cook Colliery Washplant. BWA provided Boilermakers, Riggers, Electricians, Plumbers, Operators, Supervisors and Managment for this project. BWA Engineering Fabricated over 400T of steelwork and fabricated over 1500m of large sized pipework.
BWA Engineering’s Fabrication and Installation Scope of Works:
- Structural steelwork, Grating, Handrails, Stairs, Walkways, Roofing
- Pipework, Tanks, Launders, Feed Boxes
- Grizzleys
- Hoppers
- Underpans
- Pump Frames
- +more
BWA Engineering’s Installation Scope of Works:
- Conveyor Systems
- Rotary Breaker Station
- Spirals
- Vibrating Screens
- Cyclones
- Magnetic Seperators
- Sieve Bends
- Belt Press Filters, Drum filter
- Thickener Tank
- Overhead Crane
- Pumps and Sumps
- Apron Feeder
- +more